Progress Updates
To bring the latest updates on the project developments to our customers on periodic basis, we are proving the highlights along with the latest site work-in-progress picture in this page. Our customers can get very clear picture on the project progress from this page along with Project Plan updates.

Udated on 6th Dec 2015 at 1:00 PM IST
- Village Theme Park development is completed
- Model Kuteer Construction in Plot No 15 is reached final stages of the work
- A new Villa work started in Plot No. 8
- Functional Gardens started growing organically
- Phase-1 scope of Solar Power Implementation is completed
- Drip Irrigation work in Private Site and Common areas is completed

Udated on 14th May 2015 at 2:00 PM IST
- Landscaping Work is in full speed
- Earth construction - Stabilized Compressive Mud Blocks production started at Site
- Rain Water Harvesting and Complete Water Management Infra development work is almost complete
- Layout Electrification is completed.
- End to End Solar Power implementation for entire layout is divided into 3 phases and Phase 1 materials are ordered and expected to implement at site by June 2015.

Udated on 11thSep2014 at 4:17 PM IST
- Gravel Road Formation is completed.
- Underground Sewage , Water & Electrical lines are laid.
- Road Side Plantation has started.
- Electrical Transformers are installed and Electrical lines are drawn.
- Front Arch structure is ready and Plastering is completed and Painting work is going on.

Updated on 18thApr2014 at 2:30 PM IST
- Earth Excavation Work is done for Underground Sewage. The overall depth is 4 ft from the finished road level to avoid any damages to the pipes.
- Planning to lay PVC Soil, Waste Water pipe confirming to IS 13592 and 4985, Type B - 6 kg/sq cm pressure rated with rubber ring (confirming to IS 5382).
- Followed by this Work, Underground water pipe lines will be laid around 3 ft depth.

Updated on 3rdJan2014 at 6:00 PM IST
- Compound Wall work is going with Full Speed. We are expecting to complete the Compound Wall in Jan 2014.
- Total 6 Feet height Wall covering all sides boundary of Geen Woods Township
- There will be broken glass pieces on top of the wall for additional security
- Compound Wall is constructing with 6" Solid Blocks with Pointing for good and rustic finishing.